Search History

Procurement Guide

Stock, MOQ, lead time, payment and claims — stated up front

This page carries what a purchasing or QA team normally asks before the first order: what we hold in stock, how fast we ship, how samples and bulk quantities are priced, which documents travel with every batch, and what happens when a batch is off specification. The figures below are our standard commercial terms; the numbers that bind your order are the ones on your quotation and in the signed specification.

2 working hours Reply time for enquiries and quotation requests, within business hours.
5–7 working days Dispatch for standard grades held in stock, after confirmation and deposit.
COA per batch Issued when batch testing completes, sent for approval before shipment.
7 working days Window to raise a deviation claim, with retained sample and batch COA.
Order flow / six steps

From first enquiry to batch acceptance

Every stage produces a document, and each document is the reference for the next one. Nothing is agreed verbally that does not end up in the specification, the quotation or the batch COA.

EnquiryProduct, specification, quantity and destination market.
Specification & quotationSpec, packaging, MOQ band, lead time and terms in writing.
Sample approvalStandard sample supplied; the approved sample becomes the reference.
Order & paymentProforma invoice, then production is scheduled on the deposit.
Production & COABatch tested; COA and spec sent for confirmation before shipment.
Shipment & acceptanceDocuments travel with the goods; IQC and the claim window begin at arrival.
01 / stock & lead time

What we keep in stock, and what is made to order

Stock policy follows demand. Fast-moving standard grades are held as safety stock and ship quickly; anything with a special carrier, potency, particle size, dosage form or a first-time specification is scheduled onto production, and that production calendar sets the date.

Line type What it covers Stock position Typical lead time
Standard, fast-moving grades Vitamin D3 oil, vitamin K2 MK-7 powder, routine botanical extracts and other stable sellers. Safety stock held 5–7 working days after order confirmation and receipt of the deposit.
High-value actives Specialty and premium actives carried against steady demand. Low hundreds of kg From stock, subject to availability of the exact grade on the day you order.
Low-value, bulk-volume lines Commodity extracts and carriers sold by the tonne. Tonne level From stock, subject to the quantity you need in one release.
Made-to-order specifications Special carrier, special potency, custom particle size or dosage form, special packaging, or a first-time specification. Scheduled per order 3 days, 5–7 days, 7–10 days or up to 30 days, depending on the product and the production schedule.
Stock moves daily. Safety stock levels are not a published figure, because they shift with demand and harvest. Ask your sales contact to confirm availability of the exact grade before you plan a launch date around it.
02 / MOQ & pricing

Minimum order quantity and how price tiers work

MOQ is set by product form and packing unit. Standard specifications are available in small quantities to support formulation work; custom specifications carry a higher minimum because they consume a production run.

Standard specification

From a few grams to 20 kg

Samples come from stock. For low-value products the usual MOQ is 20 kg; a few grams to 1 kg is accepted so a new project can start without buying a full pack.

Sample from stock

Custom specification

25 kg to 500 kg

Special carrier, special potency, special packaging or a special dosage form. The minimum is reviewed against the production run before we confirm an order.

Production review

Tiered pricing

Volume bands

Price steps are set by quantity band, for example 20 kg / 100 kg / 500 kg / 1 MT. We publish the band structure; the price per band is given on your quotation.

Price falls with volume

Tier boundaries: a tier price applies to the same product, the same specification and the same packaging. Custom specifications are quoted individually, because the run length, not the quantity alone, drives the cost.
03 / samples

Free standard samples, freight by destination

Formulation work needs material to test, not a sales deck. Standard samples are free within the allowance for each product; what varies by product value is how many grams you can have, and what varies by destination is who pays the freight.

Product value Free sample quantity Freight Chargeable above the allowance
Low value 100–300 g Customer account or flat regional sample rate Sample cost plus freight, credited against the bulk order
Mid value 50–300 g Customer account or flat regional sample rate Sample cost plus freight, credited against the bulk order
High value actives 2–10 g Customer account or flat regional sample rate Sample cost plus freight, credited against the bulk order
Dispatch

3–4 days when the material is in stock

Where the material has to be produced, dispatch follows the production calendar and is agreed per product. Replacement of a sample that was lost in transit is treated as a dispatch issue, not a new order.

Repeat customers

Freight paid by us on small quantities

Once we have shipped a completed order for you, small quantities can be sent freight paid. Custom specifications and pilot-batch samples remain chargeable, and the charge is still credited against the bulk order.

04 / consistency

Sample to bulk: what we compare, and in what order

Consistency is not a promise, it is a comparison against a named reference. For every batch the reference is three documents together: the approved sample, the signed specification and the batch COA.

Compared on

Seven points of comparison

A bulk batch is judged against the approved sample and specification on exactly these points, not on appearance alone.

  • Active content
  • Specification
  • Appearance
  • Particle size
  • Odour
  • Test method
  • Key indicators
Retained samples

Two years, same batch, fully labelled

Each batch retains a sample from the same lot, with complete labelling, for two years; after that it is sealed into archive rather than discarded. That retained sample is the evidence both sides argue from.

If a batch deviates, this is the sequence

Raise itIn writing within 7 working days of receipt, with the retained sample and the batch COA.
Internal reviewWe open the case against the batch records and the QC file. Review time runs from 5 days to 3 months, depending on which tests are involved.
Third-party retestWhere the result is contested, an agreed laboratory tests both the retained sample and the goods in your warehouse.
RemedyReplacement, top-up or refund under the warranty and claim terms. Review cost follows the party found responsible.
Not treated as a quality deviation: differences caused by storage conditions at destination, by loss of temperature control in transit, or by the customer reformulating the material after receipt.
05 / payment

Payment terms by order type

Terms are stated on the proforma invoice and in the sales contract; where the two differ from this page, the contract governs. Credit is granted on assessment, not on the size of a single order.

Scenario Terms Notes
New customer, small quantity 100% T/T in advance Production or despatch is scheduled once payment is received.
Bulk order 50% T/T in advance
50% T/T against B/L copy
The balance falls due when the bill of lading is presented.
Long-term customer Up to 30 days Granted after a credit assessment; the limit and the window are stated in the contract.
Letter of credit Not accepted Payment is by T/T. If your purchasing policy requires an L/C, raise it before the order is placed.
Sample and small orders PayPal, credit card Available for small amounts; a bank charge may apply.
All quotations Ex tax, ex freight Incoterms are agreed per order and printed on the quotation.
06 / warranty

Warranty coverage and inspection on arrival

The warranty is written against documents, not adjectives: the specification, the batch COA and the regulations that apply to the material. Inspection on arrival is the other half of that arrangement.

Covered

Batch quality against the confirmed specification

Potency and active content, specification, purity, heavy metals and microbiology, where the delivered batch departs from the agreed specification, its COA or the applicable regulation.

Period: 3 months from the date of arrival, or within the product shelf life, whichever comes first.

Not covered

Causes outside our control

Force majeure, deterioration from storage or handling at destination, and material altered by the customer. These are assessed on evidence, not assumed either way.

Goes with it: the retained sample and the batch QC file, which are what the assessment reads.

Acceptance: basis, sequence, arbitration

Step What happens Reference
1. Basis agreed in advance The specification and the test methods are fixed before production, so acceptance is not negotiated after arrival. Specification, batch COA, agreed methods (AOAC, pharmacopoeial or in-house)
2. Check on receipt Confirm packaging condition, quantity and the accompanying documents against the packing list and invoice. Packing list, commercial invoice, COA
3. Incoming inspection Key indicators may be tested on arrival as part of your own IQC programme. Your IQC protocol against the specification
4. Raise within 7 working days Any non-conformity is raised in writing, and the retained sample is kept for comparison. Retained sample, batch COA
5. Arbitration if contested Where the two results disagree, an agreed third-party laboratory makes the final determination. SGS, Eurofins or another laboratory agreed in writing
07 / claims & returns

Claims: how they are raised, answered and settled

A claim is a process with a clock on it, not a complaint. The clock starts on arrival, the evidence is the retained sample and the COA, and the outcome is one of four remedies.

File the claim — within 7 working days of arrivalIn writing, with the order number, the batch COA and photographs or the retained sample. Claims after the window, or on material already used or repacked, are not accepted.
We acknowledge and open the file — 1–3 working daysRetained sample, batch records, production file and the QC archive are pulled together for review.
Determination — retained sample, COA and agreed testingWhere needed, a third-party laboratory arbitrates. The finding is written, and it says which party it applies to.
Remedy — replacement, exchange, pro-rata refund or freightConfirmed claims are settled by replacement of conforming goods, exchange, a refund in proportion, or cover of the necessary freight. The route is agreed case by case.

Return or replacement accepted

Quality deviations confirmed as our responsibility; and shipments that do not match the order in quantity, specification or packaging.

Not accepted

Material already used or repacked, claims outside the 7 working day window, loss from customer storage or transport, and custom specifications unless the cause is ours.

Replacement timing, when it is our fault: small lots go by courier, 7–10 working days from confirmation to despatch; urgent bulk lots fly, roughly 6 days from preparation to arrival; very large lots are agreed case by case. Freight on a confirmed return sits with the responsible party. To date we have not received a claim of this kind.
08 / response

Response commitments, by channel

Times below are for working days. A question that arrives on Friday afternoon is answered on the next working day, not over the weekend.

Request Commitment What you receive
Enquiry and quotation Within 2 working hours A written reply with the grade options, MOQ band and lead time.
Sample request 3–4 days to despatch when in stock Tracking details; where the material has to be produced, a date agreed per product.
Technical and quality documents Within 2 working days COA, specification, TDS, MSDS, and the certificates applicable to the product.
Production and logistics progress Proactive, from the payment date Order status and the expected despatch date, without a request from you.
After-sales and complaints Within 1 working day A named contact and the file reference for the case.
09 / documents

What travels with every batch

A COA accompanies each batch as standard. Everything else is issued according to the product and the destination, and is listed on the quotation so that nobody discovers a missing paper at the port.

Always

Certificate of Analysis, per batch

Issued when batch testing completes and sent before shipment for your confirmation, not after the container has sailed. It states the tested parameters, the results, the methods and the batch number.

Format & timing

PDF as standard, paper on request

Documents go by email and travel with the shipment. Paper copies are supplied at no charge on request; certificates that a government authority has to issue may carry a fee. English is the standard language, and other languages can be arranged for the destination.

Document list

  • COA
  • Specification
  • TDS
  • MSDS
  • Flow chart
  • Bulk pictures
  • Commercial invoice
  • Packing list
  • COO
  • Health certificate
  • Phytosanitary certificate (plant origin)
  • ISO 22000 / HACCP
  • Halal
  • Kosher
  • Third-party test report, where performed
  • Allergen statement
  • Non-GMO statement
Timing matters more than the list: the COA is sent before shipment, and the customs set is issued with the invoice and packing list. Where a destination needs a certificate we cannot issue ourselves, we say so at quotation stage rather than at the port.
10 / destination compliance

Documents and rules by destination market

Regulation follows the market of import, not the market of manufacture. The table sets out what is generally required; the applicable rule is the one in force in your market on the day of import.

Market Documents normally required Points to confirm before ordering
European Union Certificate of origin, REACH statement, sanitary or veterinary certificate where applicable. Novel food status under EU 2015/2283, additive rules, and pesticide maximum residue limits for botanical materials.
United States Entry documents and FDA prior notice where applicable, plus the batch COA. GRAS or NDI status of the dietary ingredient, FDA labelling, and banned-substance testing for sports nutrition lines.
Southeast Asia Certificate of origin, health or sanitary certificate; import licence in some countries. Halal certification for Indonesia and Malaysia, and country-by-country tariff and restricted-ingredient lists.
Certificates we can issue

Origin, health, inspection, veterinary

Certificate of origin (COO), health certificate, inspection and quarantine certificate, veterinary certificate for animal-origin material, and import-export inspection and quarantine certificate where the material is of animal origin. Halal certification is available for the large majority of our products.

Ingredients and dosage

Identity rules differ by market

Markets regulate ingredient identity and dosage differently: the EU novel food catalogue, US GRAS and NDI status, and national restrictions on specific substances such as NMN, high-dose melatonin and certain botanicals. We do not claim that a product is lawful in every market. We state the requirements we know, supply the technical documents that support them, and the compliance decision rests with the importer and the local regulator.

What our documents are, and are not: our products are sold as food and dietary ingredients, with no medicinal claim. The documents we provide are technical: assay and content, heavy metals, microbiology and the other routine indicators for that product. Whether a formulation may be sold in a given market is a decision for the importer.
11 / quote, delay & change

Quote validity, force majeure and changes to an order

Three situations cause most disputes between purchase order and delivery. Each one has a rule that can be checked before the order is placed.

Quote validity

Set by the exchange rate

Quotations are stable in normal conditions and run with currency movement. Because raw material, freight and FX move, an expired quotation is re-confirmed before it is used. Large or long-term orders can be covered by a framework agreement that fixes the price for a defined period.

Force majeure

Notice, evidence, then extension

Natural disaster, epidemic, government action, war or a break in logistics releases both parties from liability for the delay. The affected party must notify promptly and provide evidence, both sides work to limit the loss, and the schedule is extended once performance resumes.

Order changes

Cheap before payment, costly after scheduling

Quantity and specification can be changed by agreement before payment is confirmed. Once a batch is scheduled, the change has to be raised as early as possible, and the resulting cost and schedule impact is agreed between the parties. A cancellation is settled against the cost already incurred.

12 / FAQ

The five questions that come up before a first order

Short answers below; the sections above carry the detail. Anything not covered here goes to the sales team with your specification.

What is your MOQ?

Standard specifications run from a few grams up to 20 kg, and for low-value products the usual MOQ is 20 kg. A few grams to 1 kg is accepted to support a new project, and samples are supplied from stock.

Custom specifications, meaning a special carrier, potency, packaging or dosage form, start at 25 kg and can reach 500 kg depending on the production run, so they are reviewed before we confirm.

Are samples free, and who pays the freight?

Standard samples are free for B2B formulation customers within the allowance for that product: 100–300 g for low-value products, 50–300 g for mid-value products and 2–10 g for high-value actives. Freight is at the customer's account, or charged at a flat regional sample rate.

Beyond the allowance, and for custom or pilot-batch samples, sample cost and freight are charged, and the sample charge is credited against the bulk order.

How long is the lead time?

Standard grades held in stock normally dispatch 5–7 working days after order confirmation and receipt of the deposit. Made-to-order specifications are scheduled onto production and take 3 days, 5–7 days, 7–10 days or up to 30 days, depending on the product and the production calendar.

For products without stock, the production schedule decides the date, so confirm the exact grade with your sales contact.

What payment terms do you accept?

T/T is the standard method: 100% in advance for new customers and small quantities, and 50% in advance with 50% against the B/L copy for bulk orders. Long-term customers with an approved credit assessment can be granted terms of up to 30 days. Letters of credit are not accepted.

Small sample orders can be paid by PayPal or credit card. All quotations exclude tax and freight, and Incoterms are agreed per order.

What happens if the bulk batch does not match the approved sample?

Raise it in writing within 7 working days of receipt, with the retained sample and the batch COA. We compare the batch with the approved sample, the specification and the COA on active content, specification, appearance, particle size, odour and test method, acknowledge the claim within 1–3 working days, and retest through an agreed third-party laboratory such as SGS or Eurofins where the result is contested.

If the deviation is confirmed, we replace the goods, top up the quantity or refund in proportion, and the review cost follows the party found responsible.

Next step

Send the specification. We will answer with the grade, the documents and the terms.

Tell us the product, the specification, the quantity and the destination market.

Contact us

CONTACT US

If you have any queries, get in touch today! Don't hesitate. We try to take the extra step for our customer satisfaction.
CONTACT US
Your Name *
Tel/Whatsapp *
Email *
Message *
Verification code *
Click to verify
Leave a message
Your Name *
Tel/Whatsapp *
Email *
Message *
Verification code *
Click to verify